Trying to blog every month has proved a little difficult, but as its the end of year its good to tie things up.
Over the last month we have had the usual water treatment works of taking samples, fixing errant boreholes and making sure boilers blow down correctly.
The last month has seen a diverse range of activity once again. Our driller had to have his 4 wheel drive borehole machine pulled off site by the a massive tow truck after it got stuck down to its axles in soft clay.
During the last month we have completed another borehole water treatment system at a prestigious Victorian estate in the Sussex countryside.
The last month has been a real mixture of work from large flush and cleans to fixing a broken nut on a filter. It doesn’t matter about the size of the contract all clients want a good service.
In December 2011 we tried out our new flushing system on two large hotels (Stratford Upon Avon Holiday Inn and Glasgow Crown Plaza) cleaning up the chilled water without the need for harsh chemical cleaners.